Job Details

ID #53308985
Estado Pennsylvania
Ciudad Lehigh valley
Full-time
Salario USD TBD TBD
Fuente Pennsylvania
Showed 2025-01-22
Fecha 2025-01-21
Fecha tope 2025-03-22
Categoría Comercios expertos/artesanos
Crear un currículum vítae
Aplica ya

Jack Of All trades

Pennsylvania, Lehigh valley, 18101 Lehigh valley USA
Aplica ya

My Current Budget Is $1,000 Bi Weekly

Property located in Allentown by ppl center

I’ll be Responsible for all Materials Needed per project and what you feel is appropriate labor within that $1,000 budget

3rd Floor will need to be completely gutted and ready for framing and all new electrical

Preferably 1 person who has experience in demolition & carpentry & electrical

Who can put me in between major projects or down time

This will be a slow process so Scheduling will be critical so someone professional and reliable and responsible will be preferred

Each project by contract and paid at end of each project (1-3 days biweekly)

Paid Labor only I will buy all materials at Home Depot or Lowe’s which are about 5-10 min away from my property in Allentown

You will be responsible to pick up all materials needed to complete project

Job Description

2 Bedrooms

2 Closets

1 linen Closet

3 Skylights

4 Windows

4 Light Switches

7 outlets

8 recessed lighting

75% demolition completed see pictures for reference

(1) 1 wall and small part of ceiling and staircase wall need to be demolished and debris removed before framing

(2) Taking up old wood floors and putting down plywood sheeting before framing

Detailed Supply/Materials List Needed Before (3)

(3) rough framing (Ceilings, Walls, Closet and most importantly skylights)

(4) Replacement of 2 windows

Adding 2 New windows (structural)

Walling up 1 existing window (structural)

(5) rough electrical (Switches, Outlets, Lights ECT)

(6) Looking to add a 2nd electrical panel to transition from old wiring to the new wiring without having to cut off my electrical

(7) Old wiring will need to be turned off and bring down to the basement level and removed from panel box

(8) Cleaning Up All Debris and miscellaneous garbage Leaving everything clean and ready for sheetrock and Flooring

References & Pictures of previous work during the walkthrough process would be appreciated & helpful to finalize your contract with me thank you in advance for your time

The 1st couple of projects wont require much materials mostly demolition work getting everything ready for framing and electrical giving enough time for you to take exact measurements and make a supply list for the lumber needed for the framing and enough time to order the skylight windows and regular windows and doors ECT so having a detailed supply list will make things go smoothly

Aplica ya Suscribir Reportar trabajo

Puestos de trabajo relacionados

»Skilled trades
2025-01-21