Need this hole dug. It is approximately 8x2. Right now, it is already about 2 to 2 1/2 ft deep. It needs to go down to the base of the foundation which is another 5 1/2 ft or so. I'll cut the drain pipe out so it will be easier to dig. You will not have to fill it back; I'll do that myself. Located in Glendower Place Community which is just up the hill from Miamitown (and just down the hill from the Dew Drop Inn.)
Job Details
ID | #54095443 |
Estado | Ohio |
Ciudad | Cincinnati |
Full-time | |
Salario | USD TBD TBD |
Fuente | Ohio |
Showed | 2025-06-30 |
Fecha | 2025-06-30 |
Fecha tope | 2025-08-29 |
Categoría | Laboral general |
Crear un currículum vítae | |
Aplica ya |
Need a Hole Dug
Ohio, Cincinnati, 45201 Cincinnati USA