Scope:
1. Tear Off Existing Tile Roof
2. Re-Nail Deck to Code
3. Install PSU30 Titanium underlayment (pay attention to NOA. Needs to be back nailed with tin caps and shingle nails at 6” on center)
4. Install Copper Drip Edge (custom made)
5. Install Copper valleys with cleats (custom made)
6. Install Copper head wall flashing / apron flashing below louver vents in gables (need to field verify measurements once torn off)
7. Install Copper Flashing Channel and Counter Flashing Around all Roof Curbs. Install Copper L Flashing on Rear of Curb
8. Build New Plywood Saddle/Cricket and Cover with Underlayment at curbs missing crickets/saddles
9. Install Pressure Treated Wood Blocking on Hips and Ridges in Order to Install Hip and Ridge Tile
10. Install Fall Protection Anchors on Each Side of Ridge in Accordance with Roof Plans.
11. Install Verea Clay Tile (Mechanically Attached). Using Hurricane Clips. Must use 3 way ridge. Each Tile will be installed with 1 #8 stainless steel screw as well as the Verea Hurricane Clip.