Job Details

ID #52469551
Estado Distrito de Columbia
Ciudad Washington
Full-time
Salario USD TBD TBD
Fuente Distrito de Columbia
Showed 2024-09-08
Fecha 2024-09-08
Fecha tope 2024-11-07
Categoría Arquitecto/ingeniero/CAD
Crear un currículum vítae
Aplica ya

Construction Scheduler / Claims Analyst

Distrito de Columbia, Washington 00000 Washington USA
Aplica ya

Job Description: Construction Scheduler / Claims Analyst

We are currently looking for a full-time professional to supplement our current staff. This is an entry to mid-level position suitable for a recent engineering graduate.

Education: A Bachelor of Science degree with a major in Engineering or Construction Management is required.

Experience: Up to 5 years of related work experience in building construction, preferably working in project management with a general contractor. Experience in P6 scheduling software is favored.

Company Description: Capital Construction Consultants, Inc., a dynamic and growing consulting firm headquartered in Tysons Corner, VA is seeking a prospective team member and professional capable of supporting Principals with planning, tracking, forensics analysis, and reporting of construction schedules and construction costs on projects of varying type, size, complexity, and level of risk.

Our firm includes as our distinguished clients most major nationwide construction firms as well as many local and national law firms and insurance companies.

Responsibilities (specific duties will change for each project): The position may require significant interaction with client project managers, architects, design engineers, senior technical personnel, attorneys, and other client personnel. This is a dynamic growth opportunity with long-term potential for a qualified individual. This position may evolve into taking the lead with your own clients.

Detailed Responsibilities/Duties/Tasks - The successful candidate will work under the supervision of a Principal in the Firm and be required to:

Read and understand Contract Drawings and Specifications.

Develop baseline project schedules, and maintain and report on job progress.

Analyze, evaluate, and forecast current status against the established baseline schedule.

Develop and/or update resources and actual performance.

Analyze progress and reasons for any shortfalls.

Develop monthly update reports with current progress indicators.

Assess the impact of design or construction changes and schedule slippages.

Develop Narrative Reports of Schedule Progress.

Analyze Construction claims.

Perform other responsibilities associated with this position as may be appropriate.

The prospective team member may establish, maintain, and audit construction project schedules as necessary for comprehensive analysis and/or management. This is an entry to mid-level position that offers additional on-the-job training as needed with significant growth opportunities.

MUST BE a U.S. or Naturalized citizen.

Interested and qualified candidates should email your resume for consideration and/or additional information.

Aplica ya Suscribir Reportar trabajo