Below is the scope of work. If you are interested, please send us a message with an estimate.
Scope of Work
Layout change - please see the existing layout and the proposed layout
Plumbing
Install water lines to new rain shower head, shower faucet and shower hand-held location
Install water lines to the two vanity faucets
Install water lines to new tub faucet
Install drain line to fit shower size
Install drain line for stand-alone tub
Install drain lines for two vanity sinks
Install a faucet for tub
Install two vanity faucets
Install shower head, faucet and hand-held
Install linear drain in shower under the rain shower head by the wall
Curbless Shower
Slope floor joists to allow for a new curbless 5'x8' or 5'6" x 8' shower pan with linear drain
Build a bench 1.5' deep, span the 8' wall
Build shower niche
Tiles
Install hardie backer on shower walls, niche, ceiling, the entire bathroom floor, wall behind the tub
Install new tiles on the entire bathroom floor, shower walls, shower floor, shower ceiling, the half wall behind the tub, the half bathroom (all sides) next to the toilet
Install pre-assembled vanity and countertop with sink already installed.
Install vanity backsplash
Install new PVC baseboards
Install exhaust fan with venting leading outside, fan controlled by humidity control sensor switch by the door
Install toilet and bidet
Install LED mirror (no vanity lights)
Install toilet paper holder, towel rack
If the subcontractor damages the drywall, they are responsible for patching and repairing it.
We will have a permit for this bathroom; the subcontractor will need to attend and pass all inspections.
Existing Layout and Picture of bathroom:
Proposed layout of the bathroom
(labor and rough materials)
Completion time:
14 days
Material we will provide:
Faucets
Tiles
Grout
LED lights
LED mirror
Shower door
Exhaust fan
Humidity control sensor switch
Vacancy sensor switch
Paint
Toilet paper holder
Towel rack
Vanity with countertop and sink
Vanity backsplash
GFCI outlets