Job Details

ID #54148779
Estado California
Ciudad San francisco bay area
Full-time
Salario USD TBD TBD
Fuente California
Showed 2025-07-11
Fecha 2025-07-11
Fecha tope 2025-09-09
Categoría Laboral general
Crear un currículum vítae
Aplica ya

Looking for a licensed bathroom subcontractor

California, San francisco bay area 00000 San francisco bay area USA
Aplica ya

Below is the scope of work. If you are interested, please send us a message with an estimate.

Scope of Work

Layout change - please see the existing layout and the proposed layout

Plumbing

Install water lines to new rain shower head, shower faucet and shower hand-held location

Install water lines to the two vanity faucets

Install water lines to new tub faucet

Install drain line to fit shower size

Install drain line for stand-alone tub

Install drain lines for two vanity sinks

Install a faucet for tub

Install two vanity faucets

Install shower head, faucet and hand-held

Install linear drain in shower under the rain shower head by the wall

Curbless Shower

Slope floor joists to allow for a new curbless 5'x8' or 5'6" x 8' shower pan with linear drain

Build a bench 1.5' deep, span the 8' wall

Build shower niche

Tiles

Install hardie backer on shower walls, niche, ceiling, the entire bathroom floor, wall behind the tub

Install new tiles on the entire bathroom floor, shower walls, shower floor, shower ceiling, the half wall behind the tub, the half bathroom (all sides) next to the toilet

Install pre-assembled vanity and countertop with sink already installed.

Install vanity backsplash

Install new PVC baseboards

Install exhaust fan with venting leading outside, fan controlled by humidity control sensor switch by the door

Install toilet and bidet

Install LED mirror (no vanity lights)

Install toilet paper holder, towel rack

If the subcontractor damages the drywall, they are responsible for patching and repairing it.

We will have a permit for this bathroom; the subcontractor will need to attend and pass all inspections.

Existing Layout and Picture of bathroom:

Proposed layout of the bathroom

(labor and rough materials)

Completion time:

14 days

Material we will provide:

Faucets

Tiles

Grout

LED lights

LED mirror

Shower door

Exhaust fan

Humidity control sensor switch

Vacancy sensor switch

Paint

Toilet paper holder

Towel rack

Vanity with countertop and sink

Vanity backsplash

GFCI outlets

Aplica ya Reportar trabajo