We are looking for an experienced crew with window glazers and caulking for large government building project to begin soon.
Caulking:
Remove existing caulking and backer rod from all joints
remove all loose materials and freign matter that will impair the adhesion of caulking.
All joints shall be cleaned.
Install new backer rod in removed caulk locations
Wet-glazing windows:
Install new caulking to all windows
The glazing shall provide for minimum face clearances, edge clearances, and nominal bite
Face clearance shall properly cushion the glass, thermally and mechanically isolate the glass framing members and prevent glass to metal contact
Nominal bite on the glass shall provide adequate glass retention without excessive glass coverage.
Clean Windows:
Clean all exterior windows
Wash scrub windows with commercial window/glass cleaning detergent
Remove all dirt, calcium, hard water spots, and buildup from glass panels and mullions
Squeegee dry all glass panels
Remove excess water from mullions after cleaning
Must show up on time and work in a safe and timely manner.