Job Details

ID #50059845
Estado Georgia
Ciudad Atlanta
Tipo de trabajo Full-time
Fuente Turner & Townsend
Showed 2023-06-08
Fecha 2023-06-08
Fecha tope 2023-08-07
Categoría Etcétera
Crear un currículum vítae

Data Center Construction Manager

Georgia, Atlanta

Vacancy caducado!

 Turner & Townsend is looking for a Construction Manager to support a large-scale, ground-up data center construction project with our prominent technology client. The role will be responsible for all aspects of project delivery, from inception through to commissioning. The ideal candidate will have a minimum of 8 years construction field experience and the ability to be highly effective in a client facing role.Under direction of the client, the Construction Manager will be responsible for coordinating with the general contractor and architect/engineer services provider for all construction related activities on the project, including but not limited to:Site layout/design (inclusive of roads, infrastructure, site utilities, etc.).Constructability reviews of designs, identifying risk to project cost and schedule, preparing reports.Lead Turner & Townsend site project team, under the direction of the client.Ability to work well within a team and liaise with external vendors, architects, engineers, suppliers, & General Contractor.In-depth knowledge of construction management in commercial building applications including applicable building codes and standards, as well as amendments by authorities having jurisdiction.Strong working knowledge of safety in design and health and safety regulations as they apply to commercial building construction sites.  Design Phase Services Support development of Minimum Functionality Case, plus enhancement identification.Support and contribute to Value Engineering efforts (selection, coordination, comment follow-up and verification).Assist in identifying long-lead items procurement items, providing input/feedback/research related to construction market conditions.Assist with preparation of request for proposal for general contractor and commissioning agent procurements.Assist in establishing the success criteria for the project construction, including schedule, cost, technical and quality performance parameters.Review design and construction drawings against project requirements and for constructability issues and concerns, with follow-up and verification with GC and A/E.Participate in risk identification and mitigation planning for cost and schedule risks.Assist in developing baseline schedule and provide regular progress update on all activities.Participate in Criticality Assessment (workshop to identify critical aspects of design and construction that may require owner witness/hold points and oversight of inspection, testing and acceptance). Design and Construct  Participate in Interface with local authorities having jurisdiction, developers, municipal utility districts, etc., on issues regarding site development, e.g., utility tie-ins, permitting, etc.Participate in review of Product Data Submittals in coordination with technical reviewers.Coordinate with Commissioning Agent during development of Commissioning Plan and execution of Plan.Review project submittals and RFI. Construction Phase Services including Commissioning and Handover to Operations Reviews the general contractors and key subcontractors project schedule for alignment with contract requirements.Provide oversight of general contractor during construction phase activities, including regular site visits and review construction work.Attend daily construction status meetings and Owner, Architect, Contractor meetings as scheduled.Review and report on the overall construction effort and progress.Evaluate of the project schedule with relation to actual field production.Coordination with Cost and Scheduling representatives for project reporting and dashboard updates.Coordination with Document Controller to ensure project documentation is loaded into client system of record.Supports observation and issue tracking/resolution and punch-list, coordination with A/E.Support In-Process and Final Inspection and Test activity conducted by GC and Commissioning Agent.

Suscribir Reportar trabajo